Straddle Monorail Traffic System
Straddle monorail wheel changing system
Depot system that automates vehicle lifting, bogie lowering and bogie movement during straddle monorail bogie changeouts, including horizontal-wheel tension testing. Maximum vehicle lift is 40 tonnes with no more than 4 mm height difference between any two lift points. Disassembled bogies up to 5 tonnes and 2.2 m long.

Features
Automates vehicle lifting, bogie lowering and bogie movement during change-outs
Maximum vehicle lift 40 tonnes with no more than 4 mm height difference between any two lift points
Handles disassembled bogies up to 5 tonnes and 2.2 m long
Horizontal tyre pressure measurement 0 to 10 kN at plus or minus 20 N accuracy
Running tyre measurement 0 to 300 kN at plus or minus 600 N accuracy
Built-in tension detection for the horizontal wheels during change-out
Suited to automated wheel-change operations and condition management in monorail depots
Request a quote
Interested in the Straddle monorail wheel changing system?
Contact our team for full specifications, project sizing, and pricing.