Straddle monorail wheel changing system

Depot system that automates vehicle lifting, bogie lowering and bogie movement during straddle monorail bogie changeouts, including horizontal-wheel tension testing. Maximum vehicle lift is 40 tonnes with no more than 4 mm height difference between any two lift points. Disassembled bogies up to 5 tonnes and 2.2 m long.

Straddle monorail wheel changing system

Features

01

Automates vehicle lifting, bogie lowering and bogie movement during change-outs

02

Maximum vehicle lift 40 tonnes with no more than 4 mm height difference between any two lift points

03

Handles disassembled bogies up to 5 tonnes and 2.2 m long

04

Horizontal tyre pressure measurement 0 to 10 kN at plus or minus 20 N accuracy

05

Running tyre measurement 0 to 300 kN at plus or minus 600 N accuracy

06

Built-in tension detection for the horizontal wheels during change-out

07

Suited to automated wheel-change operations and condition management in monorail depots

Request a quote

Interested in the Straddle monorail wheel changing system?

Contact our team for full specifications, project sizing, and pricing.