Pavement, Roadside & Bridges
Guardrail Pile-Driving Equipment
A purpose-built rig for highway W-beam guardrail pile installation. A wheeled engineering chassis carries an integrated drive/extract/drill arm that handles driving, drilling, and extraction from a single platform, with on-board noise-suppression and dust-collection equipment to keep emissions inside acceptable limits for live-traffic and noise-sensitive environments. Intelligent control delivers autonomous positioning, trajectory planning, and automatic driving and drilling, with real-time monitoring of construction parameters.

Features
Wheeled rigid engineering chassis offers easy redeployment, high payload capacity, and stable pile-driving geometry
85-class driving hammer combines high impact frequency with strong driving energy for fast pile installation
Single-platform pile driving, drilling, and extraction, with sequences that run continuously for high overall throughput
Smart construction control delivers autonomous positioning, trajectory planning, and automatic driving and drilling, with real-time monitoring of construction parameters
Built-in noise suppression and dust collection protect operators and reduce site disturbance
Branded diesel engine package with emissions-controlled exhaust output for use in regulated working environments
Request a quote
Interested in the Guardrail Pile-Driving Equipment?
Contact our team for full specifications, project sizing, and pricing.