Skip to main content

Pavement, Roadside & Bridges

Guardrail Pile-Driving Equipment

A purpose-built rig for highway W-beam guardrail pile installation. A wheeled engineering chassis carries an integrated drive/extract/drill arm that handles driving, drilling, and extraction from a single platform, with on-board noise-suppression and dust-collection equipment to keep emissions inside acceptable limits for live-traffic and noise-sensitive environments. Intelligent control delivers autonomous positioning, trajectory planning, and automatic driving and drilling, with real-time monitoring of construction parameters.

Guardrail Pile-Driving Equipment

Features

01

Wheeled rigid engineering chassis offers easy redeployment, high payload capacity, and stable pile-driving geometry

02

85-class driving hammer combines high impact frequency with strong driving energy for fast pile installation

03

Single-platform pile driving, drilling, and extraction, with sequences that run continuously for high overall throughput

04

Smart construction control delivers autonomous positioning, trajectory planning, and automatic driving and drilling, with real-time monitoring of construction parameters

05

Built-in noise suppression and dust collection protect operators and reduce site disturbance

06

Branded diesel engine package with emissions-controlled exhaust output for use in regulated working environments

Request a quote

Interested in the Guardrail Pile-Driving Equipment?

Contact our team for full specifications, project sizing, and pricing.